• 
    
    <ul id="w2q0w"><sup id="w2q0w"></sup></ul>
  • <ul id="w2q0w"><sup id="w2q0w"></sup></ul>
  • <fieldset id="w2q0w"><menu id="w2q0w"></menu></fieldset>
    <li id="w2q0w"></li>
    <tfoot id="w2q0w"></tfoot>
    <xmp id="w2q0w"><tfoot id="w2q0w"></tfoot></xmp>
    Shandong Tianyu Construction Machinery CO.,LTD.
    Add:Qihe Economic Development Zone, Shandong Province
    Tel:+86-534-5678900
    Fax:+86-534-8997399
    E-mail:tyjsjx2002@163.com
    Postcode:251100
    WebSite:http://www.www.328543.com
    Alibaba:https://sdtyjx.en.alibaba.com
    Industry information

    Daily maintenance of concrete mixing building station in winter

    Daily maintenance of concrete mixing building station in winter

    1. Before starting the machine, the air in the control room should be turned on for about half an hour. After the indoor temperature is raised, the industrial computer and electrical equipment are started.

    2. After the construction of the mixing station is completed on the same day, the water pump, drain pump and water metering equipment should be drained to prevent frost cracking pipelines and pump bodies and valves.

    3. When the temperature is lower than zero degrees Celsius, the aggregate conveying belt is used to reduce the weight or adjust the tail adjustment lever to relax the belt, so that the belt does not slip.

    4. The admixture will crystallize when the ambient temperature reaches zero, and will change from liquid to semi-flow state. Before each start-up, the admixture device should be opened first, and the admixture should be evenly stirred and then turned on to prevent the pump from burning out due to idling. seal.

    5. Drain the air compressor, gas storage tank, triplet, etc. to prevent freezing.

    6. After each construction of the mixing station, the remaining materials of the gravel silo should be emptied to prevent the ice from affecting the next normal use.

    7. The gear oil of each reducer should be replaced; check the scraper plate of the replacement belt; it is recommended to use 1# or 2# lithium base grease to prevent the oil supply pipe from being blocked.

    主站蜘蛛池模板: 国产精品国产三级国产AⅤ| 久久夜色精品国产亚洲av| 国产精品亚洲一区二区在线观看| 欧美精品欧美人与动人物牲交| 国产午夜精品理论片久久| 国产精品三级在线| 欧美精品欧美人与动人物牲交| 欧美精品福利在线视频 | 成人国产精品高清在线观看| 亚洲精品一级无码鲁丝片| 精品久久久久国产免费| 欧美亚洲国产精品第一页| 2021久久精品国产99国产精品| 无码国产精品一区二区免费16| 亚洲国产精品碰碰| 久久久无码精品午夜| 国产亚洲美女精品久久久| 日韩蜜芽精品视频在线观看| 国产精品久久成人影院| 欧洲精品99毛片免费高清观看| 日韩精品免费一线在线观看| 国语自产精品视频| 国产成人1024精品免费| 久久99久久99小草精品免视看| 91老司机深夜福利精品视频在线观看| 久久精品国产亚洲av影院| 无码人妻精品中文字幕| 亚洲欧美精品AAAAAA片| 亚洲爆乳精品无码一区二区| 精品无码无人网站免费视频| 国产99视频精品专区| 日本一卡精品视频免费| 亚洲国产另类久久久精品| 亚洲线精品一区二区三区| 亚洲中文精品久久久久久不卡| 婷婷成人国产精品| 老湿亚洲永久精品ww47香蕉图片| 国自产精品手机在线观看视| 国产精品无码无卡无需播放器 | 久久99精品久久久久久久不卡| 亚洲国产精品无码久久98|